|
|
|
Discovery OV103 Launch: Sunday, December 19, 1999 7:50 PM (eastern time) |
| Crew |
|
| Commander: | Curtis L. Brown |
| Pilot: | Scott J Kelly |
| Mission Specialist 1: | Steven L. Smith |
| Mission Specialist 2: | Jean-Francois Clervoy |
| Mission Specialist 3: | John M. Grunsfeld |
| Mission Specialist 4: | Michael Foale |
| Mission Specialist 5: | Claude Nicollier |
| Launch | |
| Orbiter: | Discovery OV103 |
| Launch Site: | Kennedy Space Center, Florida |
| Launch Window: | 41minutes |
| Altitude: | 315 NM insertion |
| Inclination: | 28.45 degrees |
| Duration: | 7 Days 21 Hrs. 34 Min. |
| Vehicle Data | |
| Shuttle Liftoff Weight: | 4,506,759 lbs. |
| Orbiter/Payload Liftoff Weight: | 248,000 lbs. |
| Orbiter/Payload Landing Weight: |
211,129 lbs. |
| Software Version: | OI-26B |
| Space Shuttle Main Engines: (1 MB pdf) | ||
| SSME 1: 2053 | SSME 2: 2043 | SSME 3: 2049 |
| External Tank: ET-101 (5 Super Light Weight Tank) |
| Auxiliary Power Units: (900 KB pdf) | ||
| APU-1: 310 | APU-2: 204 | APU-3: 404 |
| Fuel Cells: (1.4 MB pdf) | ||
| FC-1: 110 | FC-2: 119 | FC-3: 122 |
| Landing | |
| Landing Date: | 12/27/99 |
| Landing Time: | 5:24 PM (eastern time) |
| Primary Landing Site: | Kennedy Space Center, Florida landing time approximate |
Editorial/Technical Comments: ShuttlePresskit